Joint-Venture
Partners Needed
Sweat
Equity Personnel:
Consultant must have computer system and software to do their
tasks, weekly video meetings with team members required. Individual
consulting agreement, weekly time reporting, part-time and full
time, and great for someone retired. U.S. Dollar hourly rate based
on education, achievements and required supervision level required
to do a given task. Sweat Equity reports generated and processed
quarterly for all consultants. Preference given to anyone who
has worked for an Aerospace Company or existing Space Analog.
|
|
Position |
Quantity |
Task
Description |
1 |
Grant
& Proposal Writer |
1 |
This
would need to be a person experienced and successful at getting
Grants. Experience with the SBIR program. |
2 |
Starship
Module Design |
3 |
Using
the SpaceX crew, tanker, cargo configurations to design modules
to connect together to make 1) rocket fuel plant & tank farm,
2) Under ground settlement design, etc. |
3 |
Project
Scheduling |
1 |
Shop
Fabrication, Site Assembly & Construction, Master MSC schedule. |
4 |
Energy
Generation & Storage |
1 |
Gas,
diesel, propane, methane, solar, and battery usage. |
5 |
Greenhouse
Design |
1 |
Botanist/Biologist
background, design type, vegetation type and needs analysis, lighting,
soil medium, greenhouse database, planting, water usage, harvest,
etc. |
6 |
Database
Developer |
1 |
Database
Design, Software - SQL, Access Developer
1) Logistics Database to track everything going into the MSC projects.
Database to be maintained on Earth, Space Station, Moon, and Mars
locations. Database inlcudes equipment 3D models, drawings, and
methods for 3D printing spare parts.
2) Develop Medical Procedure Databse for Earth, Space Station, Moon,
and Mars. |
7 |
Crew
Education |
1 |
Develop
an equipment training library datadase with educational text *.xls,
*.doc, *.pdf, develop training presentations, develop crew training
program, work with joint, venture partners to provide training programs
as an online certificate program, a vocational training program,
and a college training program. |
8 |
Process
Engineer |
1 |
Oxygen
Generation, PDF & P&ID generation, piping & vessel specifications,
mechanical equipment design & specifications. |
9 |
Process
Engineer |
1 |
Methane
Generation using MOXI, PDF & P&ID generation, piping &
vessel specifications, mechanical equipment design & specifications. |
10 |
Mechanical
Engineer |
1 |
Rocket Propellant Plant - Process Design for Oil & Gas Refinery,
successful completion of multiple refineries. |
11 |
Procurement |
1 |
Procurement - Oil & Gas Refinery construction project, successful
completion of multiple refineries |
12 |
Process
Engineer |
1 |
Rocket
Propellant Plant - Process Design for Oil & Gas Refinery-successful
completion of multiple refineries |
13 |
Mechanical
Engineer |
1 |
Habitat
Design - Design of Inflatable Habitats to be used within Caves or
Lava Tubes |
14 |
Engineer |
1 |
Operations
Expert for International Space Station |
15 |
Finance
Manager or Accountant |
1 |
Business
Management |
16 |
Medical
Doctor |
1 |
Hospital
operations & procedures, help Develop
Medical Procedure Databse for Earth, Space Station, Moon, and Mars. |
17 |
Geologist |
1 |
Study
of Mars topography for ice ore locations and processing, familular
in caves and lava tubes in Olympus Mons area. |
18 |
Marketing
|
1 |
AuPR
& Marketing Manager |
19 |
Design
Draftsman |
1 |
Autodesk
products - AutoCAD, Inventor, Auto Plant 3D |
|
|
|
|
|
|
|
|
|
|
|
|
|