Project
Engineering Log
The
following information is provided in PDF format from original documents
to allow visitors to follow the project activities. |
Date
Posted |
Revison |
Doc
Count |
Page
Count |
MSC-Engineering
Documentation (*.PDF) |
166 |
1,732 |
06/12/21 |
A |
1 |
17 |
|
09/15/21 |
In
Progress
Headers |
17 |
|
MSC-Engineering
Standards - Action
Items List-Cash
Expense Report, Change Order Form, Const Progress and Work Hours,
Discipline Activity Status Report, Engineering
Composite Rate Calculation, Engineering
Task List for Scheduling, Engineering Progress and Work Hours,
Line
List,
Master Equipment List, Plant
Line Sizing, Project
Status Report, Project
Trend Log, Project Progress Curves, RFI
Report, Safety Report, Earth
Perodic Table of Elements, Mars Perodic
Table of Elements, Purchase
Order Terms & Conditions |
08/10/21 |
A |
12 |
518 |
Equipment
Data Sheets - Contents
- 1 Pipe Specifications & Materials, Contents
- 2 Pipe Stress Analysis & Pipe Supports, Contents
- 3 Instrumentation, Drawings
Distributions, Sect.
2 - Heat Exchangers, Sect.
3 - Vessels, Sect.
4 - Pumps, Sect.
5 - Fire Heaters, Sect.
6 - Compressors, Sect.
7 - Air-Cooled Heat Exchangers,
Sect. 8 - Pipe Ways, Sect.
9 - Basic Plant Layout and Piping Design,
Sect. 10 - PFD-P&ID-Line Designation Tables |
09/15/21 |
In
Progress
Headers |
13 |
|
Procurement
- ENG-PROC-001
- PO-Terms-Conditions, ENG-PROC-002
- RFQ-Log, ENG-PROC-003
- Vendor-Data-Rqmts-Form,
ENG-PROC-004 - Vendor-Data-Rqmts-Aerial-Coolers, ENG-PROC-005
- Vendor-Data-Rqmts-Elect-Equip,
ENG-PROC-006 - Vendor-Data-Rqmts-Exchangers,
ENG-PROC-007
- Vendor-Data-Rqmts-Flare-Vent-Stacks,
ENG-PROC-008
- Vendor-Data-Rqmts-Instruments,
ENG-PROC-009 - Vendor-Data-Rqmts-Pressure-Vessels,
ENG-PROC-010
- Vendor-Data-Rqmts-Process-Skids,
ENG-PROC-011
- Vendor-Data-Rqmts-Pumps,
ENG-PROC-012
- Vendor-Data-Rqmts-Tanks,
ENG-PROC-013
- Vendor-Data-Rqmts-Compressors |
08/10/21 |
A |
16 |
94 |
Pipe
Class - AA.
AB, AC,
BA,
BC,
BD,
BE,
DD,
FA,
FC,
GA,
GYA,
R,
S,
W,
WA |
09/15/21 |
In
Progress
Headers |
27 |
|
Pipe
Specs. - SP-50-03-Cover-Notes,
SP-50-03-a1,
SP-50-03-a2-SP-50-03-a2s,
SP-50-03-a2z-SP-50-03-a4s,
SP-50-03-ad,
SP-50-03-am1a, SP-50-03-ar1,
SP-50-03-ba9c,
SP-50-03-c1,
SP-50-03-c2,
SP-50-03-c2hs,
SP-50-03-c2z,
SP-50-03-cd2,
SP-50-03-ce2, SP-50-03-dg5a,
SP-50-03-ga5b,
SP-50-03-k1u,
SP-50-03-l1,
SP-50-03-lf1u,
SP-50-03-lg1,
SP-50-03-lspd,
SP-50-03-n1,
SP-50-03-r1,
SP-50-03-s1 |
08/10/21 |
A |
9 |
345 |
|
08/09/21 |
A |
11 |
11 |
Equip
Data Sheets-Vessels - Horiz-Vessel-Condensate-Flash-Tank,
Horiz-Vessel-Flare-KO-Drum,
Horiz-Vessel-Inlet-Separator, Horiz-Vessel-Propane-Storage,
Horiz-Vessel-Stabilizer-Reflux-Accumulator, Horiz-Vessel-Y-Grade-Surge-Drum,
Horiz-Vessel-Y-Grade-Surge-Tanks,
Vertical-Vessel-CO2-Vent-Scrubber, Vertical-Vessel-Condensate-Stabilizer,
Vertical-Vessel-Fractionator,
Vertical-Vessel-Liquid-Contactor-Trayed |
08/09/21 |
A |
4 |
4 |
|
08/09/21 |
A |
1 |
1 |
|
08/09/21 |
A |
2 |
2 |
|
08/09/21 |
A |
17 |
17 |
Equip
Data Sheets-Pumps - Pumps-Fractionator-Feed-Pumps-Pumps-Stabilizer-Reflux-Pumps
Pumps AODO - Diaphram-Pump-Datasheet
Pumps Chemical Injection - Methanol-Injection-Datasheet
Pumps Horz Centrifugal - Cent-Pump-Horiz-1-LACT,
Cent-Pump-Horiz-2-Amine,
Cent-Pump-Horiz-3-Flare-KO,
Cent-Pump-Horiz-4-Flare-NGL-Cond,
Cent-Pump-Horiz-5-Natural-Gas-Liq,
Cent-Pump-Horiz-6-RO-Water-Amine,
Cent-Pump-Horiz-7-Raw-Well-Water,
Cent-Pump-Horiz-8-Water,
Cent-Pump-Horiz-9-Softened-Water
Pumps Rotary - Compressor-Lube-Oil-Rotary-Pump-Horiz,
Condensate-Reject-Rotary-Pump-Horiz, Glycol-Transfer-Rotary-Pump-Horiz,
Heat-Media-Transfer-Rotary-Pump-Horiz |
08/09/21 |
A |
2 |
2 |
|
08/09/21 |
A |
1 |
1 |
|
08/09/21 |
A |
1 |
1 |
|
08/09/21 |
A |
2 |
2 |
|
08/09/21 |
A |
6 |
6 |
|
08/09/21 |
A |
2 |
2 |
|
08/09/21 |
A |
2 |
2 |
|
08/09/21 |
A |
5 |
109 |
|
08/09/21 |
A |
10 |
543 |
Equipment
Design - Contents-1,
Contents-2,
Contents-3,
Sect-2-Heat Exchangers, Sect-3-Vessels,
Sect-4-Pumps,
Sect-5-Fire-Heaters,
Sect-6-Compressors, Sect-7-Air-Cooled-Heat-Exchangers,
Sect-8-Pipe-Ways,
Sect-10-Basic-Plant-Layout-and-Piping-Design, Sect-11-PFD-PID-Line-DesignationTbl |
08/09/21 |
A |
7 |
55 |
|
Date
Posted |
Revison |
Doc
Count |
Page
Count |
Systems
Codes - |
20 |
38 |
12/01/21 |
90% |
1 |
5 |
|
12/01/21 |
60% |
1 |
4 |
|
12/01/21 |
10% |
1 |
2 |
|
12/01/21 |
50% |
1 |
3 |
|
12/01/21 |
10% |
1 |
1 |
|
12/01/21 |
0% |
1 |
1 |
|
12/01/21 |
0% |
1 |
1 |
|
12/01/21 |
0% |
1 |
1 |
|
12/01/21 |
0% |
1 |
1 |
|
12/01/21 |
0% |
1 |
1 |
|
12/01/21 |
0% |
1 |
1 |
|
12/01/21 |
60% |
1 |
4 |
|
12/01/21 |
60% |
1 |
1 |
|
12/01/21 |
0% |
1 |
1 |
|
12/01/21 |
50% |
1 |
1 |
|
12/01/21 |
0% |
1 |
1 |
|
12/01/21 |
0% |
1 |
1 |
|
12/01/21 |
0% |
1 |
1 |
|
12/01/21 |
0% |
1 |
1 |
|
12/01/21 |
0% |
1 |
1 |
|
12/01/21 |
0% |
1 |
1 |
|
12/01/21 |
0% |
1 |
1 |
|
12/01/21 |
0% |
1 |
1 |
ENG-System-023
- Security |
12/01/21 |
0% |
1 |
1 |
ENG-System-024
- |
12/01/21 |
30%s
|
1 |
1 |
|
|
|
|
|
|
|
|
|
|
|
|